What Is Planning Permission in Principle?
Permission in principle (PiP) is a route to planning permission in England for housing-led development. It separates the question of whether a site is suitable in principle from the technical detail of the scheme, in two stages: a grant of permission in principle, then technical details consent. Together they equate to full planning permission (Explanatory Memorandum to SI 2017/1309).
PiP sits in section 58A of the Town and Country Planning Act 1990 and the Town and Country Planning (Permission in Principle) Order 2017 (Planning Portal). The measures were brought forward in the Housing and Planning Bill 2015 (Designing Buildings).
Two routes to permission in principle
By application: minor development only
Applying for PiP is available only for minor housing-led development: fewer than 10 dwellings, on a site under 1 hectare, with less than 1,000 square metres of non-residential floorspace. The application should be decided within 5 weeks of validation (Planning Portal). Non-housing development can be included only where housing is the main use, and the matters considered at this stage are limited to the location of the site, the type of land use and the amount of development (London Borough of Barnet).
The Planning Portal lists the application fee as £531 for each 0.1 hectare of site area before 8 December 2026, and £825 on or after that date (Planning Portal).
Through a brownfield land register
Local planning authorities keep brownfield land registers in two parts. Part 2 is a subset of Part 1, made up of the sites the authority has decided are suitable for a grant of permission in principle for residential development. Article 4 of the 2017 Order grants permission in principle for land entered in Part 2, for a number of dwellings within the range set out in the register entry. Outline or full planning permission can still be granted for sites on either part of the register (MHCLG, Brownfield land registers guidance).
Technical details consent
Permission in principle does not allow development to begin. Technical details consent must then be obtained, and its details must be consistent with the permission in principle and any conditions attached to it (Planning Portal). Technical details consent covers the remaining detailed matters, such as the design of buildings, layout and landscaping, and must be decided by the local planning authority in accordance with the terms of the permission in principle (Explanatory Memorandum to SI 2017/1309).
Timescales
|
Stage |
Timescale |
|---|---|
|
Decision on a PiP application |
Within 5 weeks of validation |
|
Applying for technical details consent after PiP by application |
Within 3 years, or a shorter period if set by condition |
|
Applying for technical details consent after PiP through a development order (brownfield register) |
Within 5 years |
Source: Planning Portal. Local authority guidance gives the determination period for technical details consent as 5 weeks for up to 9 dwellings and 10 weeks for major schemes without an environmental impact assessment (Spelthorne Borough Council).
Permission in principle in planning policy and appraisal
The National Planning Policy Framework (August 2026) defines permission in principle as a form of planning consent that establishes a site is suitable for a specified amount of housing-led development in principle, and notes that technical details consent must follow before development can proceed (NPPF, Annex B).
A grant of permission in principle does not by itself make a site deliverable for housing land supply purposes. Under the NPPF definition of "deliverable", a site with permission in principle, or one identified on a brownfield land register, should only be considered deliverable where there is clear evidence that homes will be delivered on site within five years (NPPF, Annex B).
For appraisals and land offers, local plan requirements, including affordable housing, should be clear enough to be reflected in the price paid for land. The NPPF states that neither the price paid for land nor a price agreed through an option justifies failing to meet plan policies (NPPF, policies PM12 and DM5).
Landval Edge, SDS's land valuation software, models residual land value and flags viability gaps before an offer is submitted (SDS).