Finance & Funding 07 min read

What Is Grant Per Unit (GPU)?

Grant per unit (GPU), which Homes England's guidance calls grant per home, is the amount of capital grant requested or allocated for each affordable home in a scheme. Under the Social and Affordable Homes Programme (SAHP) 2026 to 2036, grant per home is the primary metric Homes England uses to assess the value for money of funding bids (Capital Funding Guide, chapter 6).

 

SAHP is a 10-year, £39 billion programme announced at the June 2025 Spending Review. Homes England administers the funding outside London and the Greater London Authority in London (MHCLG, AHP annual report 2024 to 2025). This guide covers Homes England's approach as set out in its Capital Funding Guide.

How grant is set and assessed

Routes to funding

Homes England offers SAHP funding through two routes. Continuous Market Engagement (CME) lets partners apply for one or more schemes at any time while funding is available, either scheme by scheme (General) or across a portfolio of opportunities (Portfolio, new for SAHP). Strategic Partnerships are covered by a separate chapter of the Capital Funding Guide (Capital Funding Guide, chapter 6).

Grant as the balancing sum

Applicants provide expected costs, income, any profit and any other public funding for each scheme. Homes England identifies the viability gap by comparing total costs with the applicant's maximised financial contributions, including loan debt. Grant is the minimum amount needed to achieve a viable, deliverable and affordable scheme: the balancing sum after all other contributions have been stretched as far as the applicant's approved business plans allow. The aim is to encourage applicants to control costs (Capital Funding Guide, chapter 6).

Value for money

CME applications are assessed on value for money, strategic fit and deliverability. On value for money, the guide states (Capital Funding Guide, chapter 6):

 

  • partners must take all reasonable measures to minimise the grant requested;
  • the primary metric is grant per home, benchmarked against national area and scheme type averages;
  • Homes England scores proposals against regional and scheme type averages, comparing both the grant requested and what the scheme delivers, such as grant relative to the size of the homes;
  • schemes outside the average ranges are treated as outliers and tested further, and are funded only if Homes England understands and accepts the reasons for exceptional grant or costs, the scheme type is a priority, or it meets a strategic objective;
  • outliers are compared with genuine comparators, such as other rural, older persons' or MMC schemes;
  • schemes with very low grant per home are not automatically approved, because delivery certainty and quality also matter;
  • design and quality are considered as part of value for money, and grant can be combined with Right to Buy receipts.

Tenures assessed separately

Where a development has mixed tenures, each tenure's scheme is entered separately and assessed individually, and must stand alone with no cross-subsidy or interdependence assumed, even on the same site (Capital Funding Guide, chapter 6).

Grant rates and tenure

Homes England's chapter on programme management does not publish benchmark grant figures. It describes the benchmarks as national, regional and scheme type averages that bids are compared against (Capital Funding Guide, chapter 6).

 

The government's report on the Affordable Homes Programme notes that Social Rent rents are often around 50% to 60% of local market rents outside London, while Affordable Rent is up to 80%. It also states that the 2021 to 2026 programme delivers a higher proportion of Social Rent homes, which results in higher grant rates (MHCLG, AHP annual report 2024 to 2025).

 

Costs have also moved. In early 2023 the government asked Homes England and the GLA to let providers submit revised bids for the 2021 to 2026 programme, to reflect higher than expected construction cost increases and other pressures, including interest rates, building safety requirements and the 2023-24 rent cap (MHCLG, AHP annual report 2024 to 2025).

Published examples

The same report includes case studies with published grant figures (MHCLG, AHP annual report 2024 to 2025):

Scheme

Homes

Grant

Grant per home (calculated)

Constantine, Cornwall (Coastline Housing)

25: 17 Social Rent, 8 shared ownership

£2,333,000 Homes England grant, total scheme cost £6,709,185

about £93,300

Asfordby Hill, Melton (Sage Homes)

90: 72 Social Rent, 10 Affordable Rent, 8 shared ownership

£10.4 million Homes England grant

about £115,600

These are single schemes under the 2021 to 2026 programme, not benchmarks for SAHP.

Grant in development appraisals

Because Homes England sets grant as the balancing sum against costs, income and the applicant's maximised contributions, and assesses each tenure separately (Capital Funding Guide, chapter 6), the appraisal behind a bid needs to show those figures for each tenure on its own.

 

Two further rules matter. SAHP funding cannot be used to acquire homes secured through Section 106 agreements or equivalent planning conditions, and it is not available for Specialised Supported Housing or Temporary Social Housing (Capital Funding Guide, chapter 6).

 

Proval Vantage, SDS's development appraisal software, has grant and subsidy assumptions built in, so teams can test how different funding scenarios and grant rates affect viability (SDS). It appraises multiple tenures in a single appraisal and reports NPV, IRR and payback (G-Cloud 14 listing).