Affordable housing requirements in England are set in development plans, within the framework of the National Planning Policy Framework (NPPF). The NPPF that applies from 17 August 2026 sets out how those requirements should be evidenced, tested for viability and expressed, and it adds specific national rules for Green Belt land (NPPF, August 2026). This guide explains that framework and how it reaches individual sites.
The national framework
Assessing need
Development plans are based on a housing need assessment that sets the overall number of homes needed, using the standard method. At the most appropriate level, plans must also take into account an assessment of the size, type and tenure of housing needed for different groups, starting with those who need affordable housing, including Social Rent (NPPF, policy HO1).
Setting the requirement
Plans should set out the contributions expected from development, including the level and type of affordable housing. Requirements should be set at a level that allows the planned development to be deliverable, which reduces the need for viability assessment at application stage, and should be clear enough to be reflected in the price paid for land. Affordable housing requirements should be expressed as a single figure rather than a range (NPPF, policy PM12).
Plans should also set requirements for the type and mix of affordable housing needed locally, including the minimum proportion of Social Rent homes required as part of major development (NPPF, policy HO5).
Viability
At plan stage
Because requirements must be set at a level that keeps planned development deliverable, they are tested for viability when the plan is prepared (NPPF, policy PM12). Planning practice guidance sets the benchmark land value used in viability assessment as existing use value plus a premium for the landowner (Planning Practice Guidance: Viability).
At application stage
Development that accords with up-to-date plan policies on contributions should be assumed to be viable. A site-specific viability assessment can be submitted only in particular circumstances, such as a development materially different from those tested in the plan's viability evidence, materially different site characteristics, costs the plan's evidence did not account for, or a significant change in circumstances. Any assessment must refer back to the plan's viability evidence, fully evidence its inputs, follow the planning practice guidance approach including its standardised inputs, and be made publicly available. Neither the price paid for land nor a price agreed through an option justifies failing to meet plan policies, and the weight given to an assessment is a matter for the decision-maker (NPPF, policy DM5).
Land pricing
Because requirements should be clear enough to be reflected in the price paid for land (NPPF, policy PM12), the applicable requirement belongs in any appraisal used to set a land offer. Landval Edge, SDS's land valuation software, models residual land value against current build cost, grant and sales assumptions and flags viability gaps before an offer is submitted (SDS).
Thresholds and Green Belt land
Major development
The NPPF ties affordable housing policy to major development. For housing, major development means development of 10 or more homes, or a site of 0.5 hectares or more (NPPF, Annex B). In Designated Rural Areas, development plans may also set affordable housing requirements for residential developments that are not major development (NPPF, policy HO5).
Green Belt land
Plans must set a specific affordable housing requirement for major housing development on land released from, or approved within, the Green Belt. It may be a single rate or differential rates, must be higher than the requirement for land outside the Green Belt, and must require at least 50% of the housing to be affordable unless that would make development of these sites unviable when tested under national viability guidance (NPPF, policy HO5).
Under the "Golden Rules" (policy GB8), until such policies are in place, major housing development on Green Belt land should provide affordable housing 15 percentage points above the highest requirement that would otherwise apply, subject to a cap of 50%. Where there is no existing requirement, a 50% contribution applies by default. The cap does not apply to rural exception sites or community-led development exception sites, or where an existing local policy already requires more than 50%. The Golden Rules do not apply to land released through plans adopted before 12 December 2024, to schemes permitted on Green Belt land before that date, or to traveller sites (NPPF, policy GB8).
London: the draft London Plan 2026
In London, the Mayor's spatial development strategy also applies. The Draft London Plan published in July 2026 keeps a strategic target of 50% of homes to be genuinely affordable, and continues the Threshold Approach to Planning Applications. Schemes that provide the relevant percentage of affordable housing can follow a fast-track route through planning (Greater London Authority, Draft London Plan, July 2026).
For schemes of 36 homes or more, the draft sets these thresholds:
|
Location or land profile |
Threshold |
Altered threshold, and when it applies |
|---|---|---|
|
Location band A |
35% |
25% where the development is 100% Social Rent, or 100% Key Worker Living Rent homes in Build to Rent |
|
Location band B |
25% |
20% where at least 80% is Social Rent, or at least 80% Key Worker Living Rent homes in Build to Rent |
|
Location band C |
20% |
None |
|
Green Belt land |
50% |
35% where the development proposes significant transport infrastructure delivery |
The Green Belt threshold applies to schemes on Green Belt land whatever their location band. These figures come from the draft plan, not an adopted plan.